Case Study: Thorntonhall EV Installation
PROJECT DESCRIPTION
Electric car charging installation at parking bays serving two blocks of flats.
OUR ROLE
The Residents group undertook a building wide poll. It was established that there was an appetite from the majority of owners to install EV chargepoint infrastructure around the parking bays. After consulting with Bumblebee EV, Redpath Bruce ascertained that 50% grant funding could be secured with the Energy Savings Trust (EST) for the structural installation, while owners could liaise directly with Bumblebee to purchase the individual car chargers – supported by the Office for Zero Emission Vehicles (OZEV). Redpath Bruce presented the owners with a formal quote in March 2023.
COMPLETION
By September 2023, funds were secured from those owners who wished to proceed and RB instructed the works. Bumblebee EV commenced work on 2 October and completion was achieved in 3.5 weeks.
The owners’ EV charger consumption is connected to the common electricity supply for the two blocks of flats. The individual charger consumption is billed by Bumblebee EV and Redpath Bruce receive a credit to offset against the common electricity accounts.
AT A GLANCE
Location: Thorntonhall
Category: EV Installation
Project Value: £32,481.89 – 50% Grant Assisted
Principal Contractor: Bumblebee EV
Grant Funding Source: Energy Savings Trust Office for Zero Emission Vehicles